Sign In | Join Free | My chinacsw.com
China Henan Dowell Crane Co., Ltd. logo
Henan Dowell Crane Co., Ltd.
To Seek the speed, chase the efficiency, guarantee the quality!
Active Member

7 Years

Home > Overhead Bridge Crane >

Double Girder Overhead Bridge Crane High Efficiency With Electric Trolley

Henan Dowell Crane Co., Ltd.
Contact Now

Double Girder Overhead Bridge Crane High Efficiency With Electric Trolley

Brand Name : Dowellcrane

Model Number : Europe type

Certification : SGS IOS CE

Place of Origin : China (Mainland)

MOQ : 1 Set

Price : USD 20000-80000 /Set

Payment Terms : L/C, T/T

Supply Ability : 5000 Sets per Year

Delivery Time : 40days

Packaging Details : Main body packaged by high quality water-proof plastic woven cloths; spare parts are packed in high quality plywood box.

Application : Indoor

Warranty : 2 Years

Span : 7.5-22.5m

Working duty : A5~A8

Power supply : 3 Phase AC 380V 50HZ

Contact Now

European Standard Double Girder Overhead Crane With Electric Trolley

Product Description

1. Main Beam

The main traveling structure of the crane which spans the width of the bay and travels in a direction parallel to the runway. The bridge consists of two end trucks and one or two bridge girders depending on the equipment type. The bridge also supports the trolley and hoisting mechanism for up and down lifting of load.
2. End Trucks

Located on either side of the bridge, the end trucks house the wheels on which the entire crane travels. It is an assembly consisting of structural members, wheels, bearings, axles, etc., which supports the bridge girder(s) or the trolley cross member(s).
3. Bridge Girder

The principal horizontal beam of the crane bridge which supports the trolley and is supported by the end trucks.
4. Runway

The rails, beams, brackets and framework on which the crane operates.
5. Runway Rail

The rail supported by the runway beams on which the crane travels.
6. Hoist

The hoist mechanism is a unit consisting of a motor drive, coupling, brakes, gearing, drum, ropes, and load block designed to raise, hold and lower the maximum rated load. Hoist mechanism is mounted to the trolley.
7. Trolley

The unit carrying the hoisting mechanism which travels on the bridge rails in a direction at right angles to the crane runway. Trolley frame is the basic structure of the trolley on which are mounted the hoisting and traversing mechanisms.
8. Bumper (Buffer)

An energy absorbing device for reducing impact when a moving crane or trolley reaches the end of its permitted travel, or when two moving cranes or trolleys come into contact. This device may be attached to the bridge, trolley or runway stop.

Product Advantages

Double Girder Overhead Bridge Crane High Efficiency With Electric Trolley


Product Tags:

industrial overhead crane

      

travelling bridge crane

      
Quality Double Girder Overhead Bridge Crane High Efficiency With Electric Trolley for sale

Double Girder Overhead Bridge Crane High Efficiency With Electric Trolley Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Henan Dowell Crane Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0